Trinity
University
- Northrup Hall
Owner: Trinity University
GC: Bartlett Cocke General Contractors
Acres: 4
Pad Area: 62,000 SF
Paving Area: 65,500 SF
Before Trinity University's Northrup Hall could be constructed,
the demolition of the previous building and selective site demolition
had to be performed, both, while classes were still in session.
An existing fountain was carefully demolished because the University
desired to salvage the centerpiece and re-install it in a new
fountain display. Sitework activities included pad and site
concrete preparations, rock excavation and extensive tree protection.
|
| |
|
|
|
Byron
P. Steele II High School
Owner: Cibilo ISD
GC: Bartlett Cocke General Contractors
Acres: 65
Pad Area: 186,000 SF
Paving Area: 537,000 SF
The Byron P. Steele II High School project was a complete sitework
job. The site had multiple areas that required grading including
all sports fields and the detention pond. Severe rain delayed
the project on multiple occasions demanding field crews to spend
several hours pumping water to complete operations. M&M
provided and placed all asphalt and select fill for the building
pad. |
| |
|
|
|
St.
Mary's University Convocation Center
Owner: St. Mary's University
GC: Lyda
Acres: 10
Pad Area: 80,000 SF
Paving Area: 110,000 SF
This was another project utilizing both demolition and sitework
services. Sitework crews installed the building pad and new
parking after the existing lots were demolished. Simultaneously,
demo crews took care of the demolition of the gym and weight
room. M&M courteously salvaged some of the bricks for Alumni
to use for fundraising. |
| |
| |
|
UTSA
Downtown
Owner: University of Texas System
GC: Spaw Glass/ Centex
Acres: 3
This project consisted of the excavation and pad preparation
for the entire downtown campus. Towards the end of the project
a design build parking garage was added completely handled through
change orders. Over 15 feet of excavation along with lagging
was required in the parking garage. Because the garage was so
deep, a ramp had to be dug just to deliver the select fill.
All prep work for the interior courtyards was included in the
scope of work. |
| |
| |
|
|
| |